Experience

Tap on Valcores vast experience in PLM Projects.

Here is a short overview of previous projects.

2018-2020: Kopter Group, Switzerland

Teamcenter for Design Organization implementation, including configuration management, change management, CAD data management, document management, requirements management.

2019: Renk-Maag, Switzerland

Teamcenter-SAP interface (T4S) bi-directional implementation.

2018-2019: Johnson & Johnson, Switzerland

MES implementation, targeting genealogy tracking in the medical industry.

2016-2018: Ariane Group, France

Configuration management and Change Management. Integration into MES, both from a process view as technically. Receiving the As-Built back from MES into PLM, forming a close-loop (CLM, Closed-loop Manufacturing)

2015-2016: Sonaca, Belgium

Project Management for Teamcenter Manufacturing Project.

2014: Stadler Rail AG, Switzerland

This customer implemented Teamcenter Systems Engineering to manage customer- and authority requirements for their product. The implementation provides the management of the requirements and the linking of proving documentation to these requirements.

2013: Airlight Energy, Switzerland

End-to-end implementation of Teamcenter CAD data management with NX.

With an out-of-the box setup of NX and Teamcenter we managed to implement the solution with a minimum of effort.

2012: PLM Project Manager for Siemens PLM Software

Responsible for the planning of Siemens PLM Software resources in a Mechatronics PLM project at an international company.

In parallel, the assignment encompassed business requirement gathering.

2010 – 2011: PLM Program management in Alstom Power

For one and a half years managed one of the PLM and CAD programs in Alstom Power, with about 900 active CAD and PLM users. During this period a major step forward was made in the management of Manufacturing data, further streamlining the design-to-manufacturing process. In addition, major steps were made towards a new Teamcenter architecture and in the implementation of a global key-user concept, further strengthening the governance model.

2007- 2009: Nissan, Tokyo area, Japan

Nissan moved from an I-deas CAD and Teamcenter Enterprise PDM environment to a NX CAD and Teamcenter Unified Architecture PDM environment.

2006: Bosch-Siemens Haushalt (B/S/H/), Munich area, Germany

B/S/H/ implemented Teamcenter Engineering’s Platform Designer to manage the early design phase of their consumer electronics products. During this early design phase the architecture and variability of the product is established.

August 2005 to November 2005: Turkish Aerospace Industries, Ankara area, Turkey

At Turkish Aerospace Industries (TAI) worked on a solution to manage the as-built configuration of airplanes.

Role in the project was Solution design based on customer specification. The technical solution included Variant Management, As-Built product structure management, Interfaces to Production Management System.

April 2005 to July 2005: Alstom Power, Switzerland

Alstom Power started with the implementation of Teamcenter Engineering in 2005. In the project for the initial rollout, held responsibility for:

  • Solution design based on customer specifications
  • Solution implementation, including configuration and customization

Technical aspects of the solution included Workflow and Data Access, ITK development, CatiaManager integration and Multisite.

 

Other PLM projects (2000-2005), Italy

  • SIPA (2003-2005). Responsible for the technical specifications and the implementation of Teamcenter Engineering at SIPA. This included:
    • Teamcenter Engineering Basics, Classification, Workflow, Data access, Multiple product structure views, Multi site (Distributed Teamcenter Engineering), Visualization, Connection to ERP
    • ITK development and Java portal customization
    • Cad integration with NX and SolidEdge
  • FIAT Auto (2002). Platform support for the first combined FIAT-Opel platform. The main task was supporting the users but also included an advisory role on work methods about release procedure and data exchange.
  • Nuovo Pignione (2001). Worked on CAD import and UG/Manager integration.